Thought I'd share my experience from yesterday and people can add some ideas/helpful hints or maybe this might help someone new to this.
So, I started bright And early and had 1 1/2 gallons of approx 200 degree water to preheat the tun. Let that sit about 10 to 15 min while I heated the mash water. Dumped the 1 1/2 gallons, added the grist and added about 8 quarts of my starting mash water. Took temp and saw that it was going too high, so added 2 quarts of room temp RO water. Took temp again and was too low. I then kept chasing to get my temp up to 152, but was fighting a losing battle, only getting to 150.
I figured I'd keep it there for the 60 minute period. Check after 60 and it was down to 145. So, now I'm thinking, "stepped". Added what was supposed to be my mash out water and got it up to 160. I figured that was as good as I was going to get (much thinner mash than I wanted), so I went ahead and let it sit for another 15 at temp.
At that point, I just started with the traditional sparge and the rest of the day was uneventful.
Thoughts from the more experienced mashtun owners?
Future considerations -
- maybe I'll just heat the full mashtun with water hotter than the expected mash water calculations and let the tun heat up that way, doughing in and stirring to bring down if needed. Plus, it's easier to bring temp down than to bring it up, especially if trying to keep a certain thickness to your mash.
-definitely need a better thermometer, I have an instant read that I bought some time ago, but haven't used. Time to break that out on the next brew.