aquaman02
Well-Known Member
- Joined
- Jul 20, 2017
- Messages
- 52
- Reaction score
- 7
Auber Brew Panel with EZboil PID. Was able to mount it out of the way for a pretty sleek look I think. Will be running a 2 vessel system temporarily. Need to ultimately source the other two spike kettles in order to run the 3 vessel later. But this should work. Still need to drill a hole for the power cable and element cable to run through. The pumps plug right into the back. So, most of the wiring will be hidden. I still need to find what configuration works best as far as hoses, etc. left to right or vise versa. What do you guys think?
