number40fan
Well-Known Member
- Joined
- Jun 24, 2014
- Messages
- 462
- Reaction score
- 80
Is the existing drain that you are going to tie into run though the 6' x 7' area?
Progress!
The basement remodel is underway and will include a 6'x7' brewing space! Here's a picture of the space demo'd and with the framing up.
View attachment 214536
I have bought a 54"x18"x20" bamboo top gladiator workbench which will act as the brew stand (inspired by orangecrush). Planning to buy a Kal panel and 20 gallon kettles.
Will have a 6 foot bamboo top gladiator work table on the opposite wall that I am going to drop a 28"x20"x12" stainless sink into.
Have a local quote for a 60"x24"x12" stainless condensate hood which will vent out where the dryer vents today. Got my vortex fan today.
Going to tile the space and have a floor drain that ties into the existing basement drain.
We are also updating the house to a 200 amp electrical service which means a new panel (with room for my control panel).
Wish me luck!
And last, but not least....look what came in the mail today! Thanks to the good folks at Stout who were a pleasure to deal with.
Some nice shiny beer bling is going to look awesome against those tiles! What are your plans for the floor?
Bro, nice work! You rockin 20gal stouts there? I'm just finishing a similar setup in my garage. What kind of control panel are you gonna be workin with?
Sent from my iPhone using Home Brew
Those are 20 gallon Stout kettles. Will be using a 30 amp control panel from The Electric Brewery/Spike Innovations.