Uncle Argyle
Well-Known Member
I am posting a pic of the part that worried me the most, the cold box area. I have completed the framing and the foam...it came out as well as could be expected (for my skill level anyway). I added some liquid foam to fill in the seams...still need to secure the fridge and seal that up as well.
Next I have to clean up the edges and build the door. This part has me stumped a little...I think I am going to go with a piano hinge and hasp on the other side...i need to make sure I have a good seal with door, so I may have to spend some time mulling this one over. Any suggestions??
Is there a foam strip that I can use as the door seal? Like a 1/4" thick 2 to 3" wide foam like tape strip?
Next I have to clean up the edges and build the door. This part has me stumped a little...I think I am going to go with a piano hinge and hasp on the other side...i need to make sure I have a good seal with door, so I may have to spend some time mulling this one over. Any suggestions??
Is there a foam strip that I can use as the door seal? Like a 1/4" thick 2 to 3" wide foam like tape strip?