Mineral Creek Brewery - Start to Finish e-HERMS basement electric brewery build

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

KennyM

Well-Known Member
Joined
Aug 30, 2014
Messages
74
Reaction score
30
Location
Pueblo
Good day fellow brewers! I want to share my recently completed electric brewery build with you guys and gals as all of the build threads I have read here on homebrewtalk.com have really inspired me and helped me along the way. I really look forward to following these threads.

I am a retired electronic systems engineer and started brewing after I took an early retirement in February 2014. I've always been curious about how brewing beer works but never had the time to invest in it. I started with extract kits and soon realized that all-grain was the way to go.

I started planning the brewery in September 2014 and began acquiring parts soon after that. Construction started in January 2015 and is pretty much complete as of June 2015. I am fortunate to have a very supportive SWMBO and the time and resources to devote to this project. I did all the work myself except for help with the ceramic tile which my son does for a living.

Thanks to everyone on these forums for all the terrific ideas, answers and solutions to problems you all have. I've learned so much following you all. Special thanks for some really good ideas and products goes out to the following folks as I used your products, ideas and inspiration...

Vendors:
http://www.auberins.com
http://www.brewershardware.com
http://www.brewhardware.com
http://www.ebrewsupply.com
http://www.stainlessbrewing.com
http://www.stilldragon.com
http://www.theelectricbrewery.com
http://www.zchillers.com

Forum Member Builds:
@azwillnj
@CptMidway
@Docbruw
@highland_brewer
@hunter306
@MrSaLTy
@RocketBrewer

I am splitting this into four posts:
Post 1 - Introduction
Post 2 - Brewery room build
Post 3 - Equipment build and installation
Post 4 - Control panel build and finished brewery

For those that want to see all of the photos of this build (almost 400), click here.

Thanks everyone!
KennyM
Mineral Creek Brewery
Pueblo, Colorado
 
Our basement had an unfinished area for the water heater and furnace that worked out good for the brewery. The main brew area is only 6 x 10 feet with the water heater taking up part of that. We also have a 4 x 6 foot area used for brewery storage.

Our city sewer line exits the basement above the floor grade so we have a sump that's in the way of using the whole area as well as the main drain, waste and vent piping.

I also plan on using the unfinished area under the basement stairway for fermenting.

The beginnning...
IMAG1257.jpg


IMAG1258.jpg


IMAG1259.jpg


IMAG1260.jpg




Framing going up...
IMAG1282.jpg


IMAG1288.jpg


IMAG1295.jpg




Installing electrical...
IMAG1296.jpg


IMAG1301.jpg


IMAG1303.jpg




Installing water lines...
IMAG1310.jpg


IMAG1317.jpg


IMAG1318.jpg




Drain system...
IMAG1336.jpg


IMAG1342.jpg




Insulation...
IMAG1328.jpg


IMAG1329.jpg




Wallboard...
IMAG1346.jpg


IMAG1344.jpg


IMAG1351.jpg


IMAG1362.jpg


IMAG1366.jpg




Ceramic tile...
IMAG1384.jpg


IMAG1391.jpg


IMAG1392.jpg


IMAG1400.jpg


IMAG1404.jpg


IMAG1429.jpg


IMAG1430.jpg


IMAG1431.jpg




60 Amp GFCI Panel...
IMAG1585.jpg


IMAG1440.jpg




900 CFM exhaust hood...
IMAG1450.jpg


IMAG1516.jpg




Suspended grid ceiling...
IMAG1567.jpg


IMAG1571.jpg


IMAG1576.jpg
 
The control panel is a 60 amp back-to-back panel with safety interlocking as well as a volt, amp and watt meter. I incorporated forum member @azwillnj's idea and can switch the HLT element to use either the HLT or MASH PID controller's output. This allows the HLT and MASH PID controllers to use their own tuning parameters. I use the HLT PID when heating strike and sparge water and the MASH PID during recirculation. I've included detailed logic wiring diagrams that show the details.

Panel layout and wiring diagrams...
Brewery%252520Control%252520Panel.jpg


Brewery%252520Control%252520Panel%252520120VAC.jpg

High Resolution version click here.
Brewery%252520Control%252520Panel%252520Panel%252520240VAC.jpg


High Resolution version click here.



Panel components...
IMAG1465.jpg


IMAG1468.jpg




Templates made with Microsoft Visio...
IMAG1487.jpg


IMAG1490.jpg


IMAG1515.jpg




Panel cutouts...
IMAG1498.jpg


IMAG1499.jpg


IMAG1505.jpg


IMAG1519.jpg


IMAG1523.jpg


IMAG1526.jpg




Installing panel components...
IMAG1527.jpg


IMAG1528.jpg


IMAG1544.jpg


IMAG1537.jpg


IMAG1538.jpg


IMAG1555.jpg


IMAG1562.jpg




Wiring control panel...
IMAG1682.jpg


IMAG1683.jpg


IMAG1733.jpg


IMAG1749.jpg


IMAG1752.jpg


IMAG1757.jpg


IMAG1760.jpg


IMAG1761.jpg




Control panel complete...
IMAG1759.jpg


IMAG1766.jpg


IMAG1768.jpg


IMAG1773.jpg





Finished brewery...
IMAG1769.jpg


IMAG1770.jpg


IMAG1772.jpg


IMAG1771.jpg


IMAG1774.jpg


IMAG1775.jpg


IMAG1767.jpg



Thanks for sticking around this far. I'm no expert on this stuff but let me know if you have any questions.
Again, you can click here to see all the photos of the entire build.

<Cheers>
KennyM
 
It's nice to know there are still people in the world that are sicker than me :D
Amazing build! Happy that you got some inspiration from my build, and can't wait to hear how your first brew goes.
 
It's nice to know there are still people in the world that are sicker than me :D

Haha no kidding!

Until now I have been slightly embarrassed to let people see my excessively anal wiring job. Now I don't feel so bad knowing someone else has such a work of art sealed behind a closed door. Because WE know what's in there, right? :ban:
 
Amazing. I have a 1 Brewer's Hardware 20 gallon kettle as well. My future goal is to have something like this, thanks for the inspiration. Wish I had more electrical skills.
 
Haha no kidding!

Until now I have been slightly embarrassed to let people see my excessively anal wiring job. Now I don't feel so bad knowing someone else has such a work of art sealed behind a closed door. Because WE know what's in there, right? :ban:

Indeed GotPushrods. It comes from years of working in industrial panels and saying to myself I'd never do "that" to the insides of a panel I am responsible for.

Thanks everyone, it's been a fun project the past 6 months. First official brew day results soon...
 
Killer build. Wish the inside of my panel looked 1/2 that nice. I think use DIM rails is the way to go.

What size are those site glasses on your pumps?
 
Your attention to detail and organization are first rate. Definitely a brew space to be proud of!
 
Killer build. Wish the inside of my panel looked 1/2 that nice. I think use DIM rails is the way to go.

What size are those site glasses on your pumps?

Thanks TechyDork, and you are right, 35mm DIN rail makes things so much easier and gives you a lot of flexibility during layout.

The sight glass is 1" and available at Brewer's Hardware. I only have one and it's installed on the inlet of the wort pump to view clarity during mash recirculation.
http://www.brewershardware.com/TC10SG.html
 
@KennyM amazing job dude! Completely finishing a space like this makes it look so great. I went the cheap route and didn't finish my whole space...functional but nowehere near as pretty. Looking forward to some brewday pics!

Where did you get the rubber matting?
 
Thanks everyone for the comments.

Can you take a video when you brew on this thing? Looks great.

I have a simple video up showing the initial cleaning run and water/element test and a short pan around the brewery: https://youtu.be/YyQCI7_8WT8
I'll try and do a brew video in the future.


is it alright if I ask about total price?
Not exact figures but about 4K on the room, plumbing, electrical, sink/worktables, vent hood and fixtures and about 6K on the kettles, pumps, chiller, hardware, control panel and tools/equipment/supplies.

Working on posting a brew day review from 6/25/15. Stay tuned...
 
Good day fellow brewers!
I was able to do a break-in brew day on 6/25/15. I chose a simple Blonde Ale 5 gallon batch recipe. Everything worked out fairly well and I hit the numbers relatively close to expected. Have a few volumes in Beersmith to adjust but not bad for the first run. We'll see how it turns out after fermentation is complete.

The following photos are from brew day...

Setting up brewery. New RO water system not yet online.
IMAG1788.jpg



Recipe in Beersmith...
IMAG1802.jpg



Water profile in Bru'n Water...
IMAG1793.jpg



Measuring out water salts...
IMAG1792.jpg



Milling grain...
IMAG1790.jpg



Mash in...
IMAG1797.jpg



Begin recirculation...
IMAG1795.jpg



Temperatures during mash recirculation...
IMAG1798.jpg



Calibrating pH meter and getting refractometer ready...
IMAG1800.jpg



Room temp mash pH good at 10 mins into saccharification rest...
IMAG1801.jpg



Wort color at the beginning of recirculation...
IMAG1796.jpg



Wort color after 15 min recirculation...
IMAG1804.jpg



Wort color during the sparge...
IMAG1808.jpg



Wort color at end of the sparge...
IMAG1809.jpg



Mash Tun empty...
IMAG1811.jpg



Pre-boil gravity at 1.034 @ 80 Deg F...
IMAG1812.jpg



Hop and clarifier additions...
IMAG1810.jpg



Hot break...
IMAG1814.jpg



Small holes in tubing to aerate the chilled wort...
IMAG1816.jpg



Ready for blow-off tube...
IMAG1819.jpg




Thanks again to everyone for the comments. This has been a wonderful project and looking forward to getting the system dialed in an brewing lots of yummy beer.

<Cheers>
Kenny
 
This. Is. Awesome! Well done. I will now find it hard to brew on my basic all-grain set up after seeing this.
 
Your build and presentation are a work of art! Extreme envy setting in. Congrats!
 