Hoping for some advice on my keezer build. I am putting the freezer in the basement and mounting the taps upstairs in the kitchen. Already read a ton on this and think I am going to circulate glycol with a pond pump to keep the lines cool. According to everything I read I will need to step up to 1/4 inch lines to overcome the 10ft rise I have. Sold on using bev seal ultra and John guest fittings. To protect the system from unauthorized use I am going to add a motorized ball valve into the line so I can lock it down. Now my questions
What is a good source for 1/4 inch Bev seal? Can't seem to find anything but 3/16.
With the lower resistance of Bev seal so I really need to go up to 1/4?
Seems like I need about 25 feet of line to balance a 10 ft rise at 12psi. Seem right?
Will it cause a problem with the beer in the line if I put the ball valve close to the kegerator or do I need to keep it near the faucet?
Thanks, any advice is appreciated
What is a good source for 1/4 inch Bev seal? Can't seem to find anything but 3/16.
With the lower resistance of Bev seal so I really need to go up to 1/4?
Seems like I need about 25 feet of line to balance a 10 ft rise at 12psi. Seem right?
Will it cause a problem with the beer in the line if I put the ball valve close to the kegerator or do I need to keep it near the faucet?
Thanks, any advice is appreciated