I am migrating from a kegerator and 1 beer line setup to a keezer and 4 beer lines. Keezer is in basement, which is 5 feet away horizontally and maybe 8 feet vertically. Total pipe length will maybe 15 linear feet of pipe from keezer to tower.
My plan is:
Run the length in 1 1/2" PVC. Wrap 4x 3/16" beer lines in tape and put into pipe. Put a 1/2" vinyl tube into pipe.
Then force cold air into pipe to tower. Then the return will be the 1/2" vinyl. Then I would wrap the entire pipe in insulation.
Will this work? Looking for the most cost effective method to cool.
My plan is:
Run the length in 1 1/2" PVC. Wrap 4x 3/16" beer lines in tape and put into pipe. Put a 1/2" vinyl tube into pipe.
Then force cold air into pipe to tower. Then the return will be the 1/2" vinyl. Then I would wrap the entire pipe in insulation.
Will this work? Looking for the most cost effective method to cool.