So im trying to get together a complete list of items needed and a diagram for my planned brewing setup 2.0
Im planning a 2 vessel RIMS electric system controlled by BCS-460, going to have 2 temp probes, 2-12 VDC pumps, 2 elements (1 120v, 1 240V)...Heres what I got so far for parts:
2 - 3 pin XLR mall chassis mount connector (for temp probe connections)
4 - 3 position switches (2 for pumps, 2 for elements)
2 - twist lock female receptacle (elements)
2 - 121AC Door Chime Transformer (downstep 121 VAC down to 16)
2 - DC AC Converter (convert to 12 VDC for pumps)
2 - SSR (elements)
1 - BCS-460 Controller (I believe this will take the place of PIDs but correct me if im wrong)
What I think im missing:
Think I need relays for the AC power for the SSRs for the elements
P-J if you read this, I know you tend to help a lot with the diagrams, if you could make a diagram for me to help that would be greatly appreciated.
Im also trying to do a modified version of theelectricbrewery build but have it wired to the BCS instead of PIDs
Im planning a 2 vessel RIMS electric system controlled by BCS-460, going to have 2 temp probes, 2-12 VDC pumps, 2 elements (1 120v, 1 240V)...Heres what I got so far for parts:
2 - 3 pin XLR mall chassis mount connector (for temp probe connections)
4 - 3 position switches (2 for pumps, 2 for elements)
2 - twist lock female receptacle (elements)
2 - 121AC Door Chime Transformer (downstep 121 VAC down to 16)
2 - DC AC Converter (convert to 12 VDC for pumps)
2 - SSR (elements)
1 - BCS-460 Controller (I believe this will take the place of PIDs but correct me if im wrong)
What I think im missing:
Think I need relays for the AC power for the SSRs for the elements
P-J if you read this, I know you tend to help a lot with the diagrams, if you could make a diagram for me to help that would be greatly appreciated.
Im also trying to do a modified version of theelectricbrewery build but have it wired to the BCS instead of PIDs