cantrell00
Well-Known Member
- Joined
- Jul 6, 2013
- Messages
- 840
- Reaction score
- 116
Could any of the experts here help me with the drawing below?
I intend to run a twin element Kettle as shown. Each element has it's own 20 amp breaker.
I will also be adding a PID/SSR to control a HLT.
Due to amp loading limitations, I need a selector switch to select between powering the HLT element or the second kettle element. One element on the kettle could always operate so it would be constant.
That way I can start heating the first runnings while doing the first & second batch sparge.
I know that my setup is not ideal but there isn't a practical option for dropping a dedicated 240v 60a circuit in my detached garage. Plus, this is more portable if I ever moved.
I intend to run a twin element Kettle as shown. Each element has it's own 20 amp breaker.
I will also be adding a PID/SSR to control a HLT.
Due to amp loading limitations, I need a selector switch to select between powering the HLT element or the second kettle element. One element on the kettle could always operate so it would be constant.
That way I can start heating the first runnings while doing the first & second batch sparge.
I know that my setup is not ideal but there isn't a practical option for dropping a dedicated 240v 60a circuit in my detached garage. Plus, this is more portable if I ever moved.