sTiNkFiZzle
Well-Known Member
Admirable wiring in your control box. I will be getting some of those adhesive cable tie mounts. Those 2 SSRs on the DIN rail, I presume those are for the pumps?
The adhesive tie mounts made night and day difference on this project. I picked up a huge bag of them from Home Depot for $10. I kinda went overboard with them but it helped me alot. I kinda made pathways with them, went ahead and added zip ties to each one in a medium size loop. It helped organized the wires early on and I would choose the closed path to follow because wire ended up costing way more then I expected to pay.
Yes, the SSR's are mounted to heat sinks that slide and lock on to the din rails.