I have done some searching and get a very broad range of results...
I am looking to see if anyone has examples of different ways they routed their CO2 lines into the keezer other than through the built collar(my build doesnt use a collar).
Im thinking of drilling a hole in the side of the lid, but just trying to see whats been done as far as either a fitting in the hole or just the tube straight through.
As for the tank itself it will be secured on a low shelf next to the keezer.
This is one of the next steps to completing my bar build!
Thanks!!
I am looking to see if anyone has examples of different ways they routed their CO2 lines into the keezer other than through the built collar(my build doesnt use a collar).
Im thinking of drilling a hole in the side of the lid, but just trying to see whats been done as far as either a fitting in the hole or just the tube straight through.
As for the tank itself it will be secured on a low shelf next to the keezer.
This is one of the next steps to completing my bar build!
Thanks!!