Stress level high as concrete is getting poured. Hard to undo something now if it gets messed up.

... Some things are probably best unwatched ...
Figure out how many electrical outlets you’ll need, then install twice that amount!
I was going to suggest this. When the walls are open, it is cheap and easy to put multiple sockets on a given circuit.
Put sockets in the ceiling for lighting options.
Are you having all surface mount conduit?The walls will not be framed (except where the exterior door is going to be) so I will have lots of flexibility for sockets. And I plan to have a lot of them. The electrician is coming on Tuesday to run the wire for the 100A subpanel.
Are you having all surface mount conduit?
That's going to look really nice.
Yep. The back of the new room is approximately at daylight while the front of the room is approximately at the grade of the existing driveway. There was a retaining wall there so it was either bring in a bunch of fill or dig it out for a room. Both options cost money so we might as well get some use out of it. Originally we had planned a different configuration for the brewing setup but when the builder said the room under the garage is an option, we said go for it.Haha! I had no idea that room was built into a decent grade! Cool!