LJvermonster
Well-Known Member
Hi all,
Just got a brew commander and trying to install while drilling as few holes as possible.
Is there a way to install this probe into an existing 1/2" FNPT bulkhead?
Really dont want to have to drill another 1/2" hole for the temp probe assembly that came with the brew commander.
Thanks in advance!
Just got a brew commander and trying to install while drilling as few holes as possible.
Is there a way to install this probe into an existing 1/2" FNPT bulkhead?
Really dont want to have to drill another 1/2" hole for the temp probe assembly that came with the brew commander.
Thanks in advance!