Hi there all I have just purchaced some Auber products to build me my PID setup I need help to wire it all together thought someone else might have done the same build heres what ive got . Auber syl-4352p ramp soak controller , 25 amp SSR , also a 25 amp SSRV whith rheostat to manually control the boil, 3 postion switch , flashing buzzer , green led , red led, and emergency stop switch . My method is BIAB and I am also running march pump and 4400 w element so am wanting to switch pump and element on at the same time . I hope this all make sence and would apprichate some digrams to help me .thanks in advance