scottstribling
Active Member
I have built my control box....and have found a small issue. I have a 30a system with 2 4500W elements (HERMS). Only 1 element will be on at any given. I have a PID (SYL2352) for each of the HLT and the BOIL. I have one SSR and now realize that I can not wire 2 PIDs to one SSR. I have no room to add another SSR and bigger heat sync. Anyone have an idea? One I had was to wire both PIDs to the SSR and use a power switch on each PID to stop any signal being passed to the SSR. I have attached a wiring diagram.