So I just read through all of this and am starting to get interested in eBIAB for the upcoming winter here. I have a few questions:
1st: To my understanding the contractor is used because the switches aren't rated at high enough amps? I know this design was laid out for those switches specifically but could you sub in say a 15 or 20A 120V light switch and not use the contractor? I'm electrically challenged but have a few of those laying around.
2nd: Another terminal block question. Is it as simple as hooking up the hot/neutral to one screw and then just running wires of the remaining spaces? Again, electrically challenged here.
3rd: Power source, maybe I'm just confused now but what kind of chord should be used as your main power supply.
1st: To my understanding the contractor is used because the switches aren't rated at high enough amps? I know this design was laid out for those switches specifically but could you sub in say a 15 or 20A 120V light switch and not use the contractor? I'm electrically challenged but have a few of those laying around.
2nd: Another terminal block question. Is it as simple as hooking up the hot/neutral to one screw and then just running wires of the remaining spaces? Again, electrically challenged here.
3rd: Power source, maybe I'm just confused now but what kind of chord should be used as your main power supply.