sethP
Member
Hey guys, I've been having trouble reaching a really good rolling boil on my electric stove top and it's not really an option at this point to get an outdoor gas burner. After reaching a boil and adding LME (that I've warmed in a hot water in the sink) it takes a good 15 min to get back up to temp.
So my question is: using the same setup I have now, Should I not count the time it takes to to get back to a boil in the total boil time ESPECIALLY with late additions of LME?
2-2.5 gal volumes so far.
So my question is: using the same setup I have now, Should I not count the time it takes to to get back to a boil in the total boil time ESPECIALLY with late additions of LME?
2-2.5 gal volumes so far.