Gunfighter04
Well-Known Member
I'm not a complete moron when it comes to electronics and electricity, and before I dive into a HERMs project, I'd like to get a little more understanding of how the system integrates.
I'm pretty new to PID's so my first question is. for a 240v element, does a single PID control both legs of the circuit? In otherwords does it turn of and on both phases of a 240 circuit simultaneously? If not, is one PID left in manual and the other in auto? Just trying to understand the control side of the system.
I also plan to hard mount an SS chiller into the BK, but I'm not sure what bulkhead fittings people are using for the chiller. I'm thinking of using some sort of quick disconnect fittings externally for the chiller.
I'll be starting my brewspace build out here shortly. I finished building my barn 2 yrs ago, and I have the loft (30'x40') to work with and I plan to build two 12'x15' rooms in it. One for my reloading room, and one for my brew room.
I'm pretty new to PID's so my first question is. for a 240v element, does a single PID control both legs of the circuit? In otherwords does it turn of and on both phases of a 240 circuit simultaneously? If not, is one PID left in manual and the other in auto? Just trying to understand the control side of the system.
I also plan to hard mount an SS chiller into the BK, but I'm not sure what bulkhead fittings people are using for the chiller. I'm thinking of using some sort of quick disconnect fittings externally for the chiller.
I'll be starting my brewspace build out here shortly. I finished building my barn 2 yrs ago, and I have the loft (30'x40') to work with and I plan to build two 12'x15' rooms in it. One for my reloading room, and one for my brew room.