mhermetz
Well-Known Member
So I have 3 brews under my belt with my new O2 system, Disposable tank and stone. The o2 seems to be having the opposite affect on my fermentation. It has a 2-3 day lag time, and it takes much longer to ferment. On average it takes about 7 days to reach my FG.
I aerate for a min, swirling the wand around the carboy. My last batches have all been the same beer because I'm trying to dial in the recipe. Other then having more unwanted Esters it seems fine (It may be temp control too). So is this a problem or RDWHAHB?
I aerate for a min, swirling the wand around the carboy. My last batches have all been the same beer because I'm trying to dial in the recipe. Other then having more unwanted Esters it seems fine (It may be temp control too). So is this a problem or RDWHAHB?