Hello all!
Before proceeding I really need to better focus if my actual idea is the right one. 70% of the system components have been already bought, not the valves yet.
I'm going to build an usual 1 tier 3 kettles Herms, with gas burners for the HLT and the BK and a counterflow chiller at the end of the process.
Two March pumps already here waiting to be switched on
I'd like to automate as much as I could with brewtroller
Some images will explain much better my current understanding of the process (thanks to this forum and the brewtroller as well). Let's see some!
I'm not detailing here the firing of the burners and the two different phases for sparging out.
I'm going to choose both two ways and three ways valves, the same found in the oscsys store.
If useful for anyone, here is the ppt file with the slides.
What do you think? Any correction to make?
Happy brewing time!
g_m
Before proceeding I really need to better focus if my actual idea is the right one. 70% of the system components have been already bought, not the valves yet.
I'm going to build an usual 1 tier 3 kettles Herms, with gas burners for the HLT and the BK and a counterflow chiller at the end of the process.
Two March pumps already here waiting to be switched on
I'd like to automate as much as I could with brewtroller
Some images will explain much better my current understanding of the process (thanks to this forum and the brewtroller as well). Let's see some!
I'm not detailing here the firing of the burners and the two different phases for sparging out.
I'm going to choose both two ways and three ways valves, the same found in the oscsys store.
If useful for anyone, here is the ppt file with the slides.
What do you think? Any correction to make?
Happy brewing time!
g_m