TimSTi
Well-Known Member
So today I finally built my MLT getting ready for the AG switch. I got a 50qt Igloo Ice Cube from target for $20. I used all 3/8" fittings and ball valve with 1/2" stainless steel braid. I drilled out at 5/8" hole which nipple fit snug, but it still leaked when I tested it. Bought some silicone sealant just in case so I applied some and have it drying right now. Real simple build. I lost 5* from 182-177 in 45 minutes with 5 gallons of water. Not too shabby I'd say. Lots of dead space and hopefully with grains in there it'll have a slightly lower loss. Can't wait to brew up my first AG tomorrow!
The object in the top right corner is just one of the hose clamps lying around.
I believe i spent about $45 total for everything. $20 cooler + $25 false bottom/drain parts.
The object in the top right corner is just one of the hose clamps lying around.
I believe i spent about $45 total for everything. $20 cooler + $25 false bottom/drain parts.