Hey lads, I have been building a new mash tun as my old one was small and could barely do partial mashes so any way I've built a 26l mash tun. So I'm having difficulty working out how I'm going to attach my manifold to my ball valve. I have got 1/2 inch copper T piece that I plan on attaching to my valve but how? I cant find a coupler that can do what I have in mind. Would having a hose barb with silicon tubing suffice?
Also should I leave my manifold loose in order for easier cleaning or solder it together?
I can post a pic of my equipment to help explain if need be.
Thanks for the help,
Cheers
Also should I leave my manifold loose in order for easier cleaning or solder it together?
I can post a pic of my equipment to help explain if need be.
Thanks for the help,
Cheers