So piece by piece I'm slowly getting there. Got some used kegs, drilled them out, got a SS bulkhead kit with a SS valve and SS camlock coming out of keg. I now have a plate chiller coming in the mail but I need to get some more connectors and tubing so I can actually use it. I really like my camlock fittings so I'd like to stay with those. But I eventually will get a pump so I figure I might get those fittings now too. So I drew it all out and I need like 6 camlock males, 6 camlock females, 6 barb ends to attach my hose, another valve, and the hose. I don't have my sketch in front so I probably got those numbers wrong but the point is, I'm spending more on the connectors than on the plate chiller! WTF?
When I get to work, I'll take a picture of my sketch and upload.
When I get to work, I'll take a picture of my sketch and upload.