I have an event in 9 days and would like to force carbonate 5 kegs in that time. I have limited equipment and obviously limited time. Considering all the different styles should need similar volumes of co2 is connecting them to the same regulator an acceptable practice? (with manifold that I dont own yet)
I guess I should back up and
Ask the the more obvious question. When I pressurize the keg I am supposed to leave it connected for two days? It would clearly solve my problem if I only had to "charge the keg" once then move to the next one.
The other problem I have is that the lowest temp I would be able to use is around 68
I have read hundreds of threads but haven't been able to answer many of my questions. (there are more to come)
I guess I should back up and
Ask the the more obvious question. When I pressurize the keg I am supposed to leave it connected for two days? It would clearly solve my problem if I only had to "charge the keg" once then move to the next one.
The other problem I have is that the lowest temp I would be able to use is around 68
I have read hundreds of threads but haven't been able to answer many of my questions. (there are more to come)