I just took the first step in upgrading to a HERMS System
I added a sight glass/Temp Prob port, electric heating element, and Heat exchanger coil to my HLT. Next comes digital Temp Controllers. Sorry for the poor Picture quality
Here I am just recirculating through the Coil back into the HTL to test for leaks None yet
This is the Sight glass. The T on the end will be where the temp probe goes.
The is the Coil that is attached to the Cooler lid.
I added a sight glass/Temp Prob port, electric heating element, and Heat exchanger coil to my HLT. Next comes digital Temp Controllers. Sorry for the poor Picture quality
Here I am just recirculating through the Coil back into the HTL to test for leaks None yet
This is the Sight glass. The T on the end will be where the temp probe goes.
The is the Coil that is attached to the Cooler lid.