There is ZERO chance it's going to be three months. I've already been pumping water, heating it, boiling it, etc etc through 80% of the rig. The only thing I was missing was another pump... which was temporarily solved two nights ago.
All I have to do is plumb that pump in, make a manifold for sparging, re-run a little of the electrical (which is easy) and I'm done brutha... Everything else I want to do would be cosmetic on the stand itself.
... ehh... I think they were talking about Feb 16th or something?? I dunno, I usually ignore him.
not sure that's a "likely" for me... an epic fail that lead to Coddingtons, scotch night at my place, the next SSBC meeting at my place, free tix to night of the Barrels... and then "hey, I'm going to go to Pawtucket to drink with my 'internet friends'" ??
Not sure I can move fast enough to dodge that cockpunch.