Minnowerks
New Member
Hi I'm new to the forum and I thought I would start off by offering my DIY HLT Parts list from the HomeDepot so here it is.
1x 071691236337 Rubbermaid 10 Gal Water Cooler
2x ACS ¾ Cut Washers
1x 048643025547 3/8in. Vinal Tubing
1x 04805447406 3/8 x ½ Brass Adapter Barb
2x 075875126029 SS Hose Clamps
1x 013964582826 O-Ring 10/pk
1x 042805446836 ½ x 1 1/2in Brass nipple
1x 042805447017 ¾ x ½ Brass Hex bushing
1x 032888110328 1/2in Ball Valve
1x D4301-40 Pipe Joint tape
1. Take out faucet valve by unscrewing from inside of cooler, remove rubber grommet
2. Install ball valve assembly through cooler from outside in:
Ball valve, tapped nipple, washer
3. Finish assembly from the inside of cooler
O-ring, washer, brass hex bushing tighten firmly
4. Install 3/8in. Barb adapter using the tape, tighten, squeeze over tubing
5. Heat some water, take temp. and you are ready to sparge!:rockin:
1x 071691236337 Rubbermaid 10 Gal Water Cooler
2x ACS ¾ Cut Washers
1x 048643025547 3/8in. Vinal Tubing
1x 04805447406 3/8 x ½ Brass Adapter Barb
2x 075875126029 SS Hose Clamps
1x 013964582826 O-Ring 10/pk
1x 042805446836 ½ x 1 1/2in Brass nipple
1x 042805447017 ¾ x ½ Brass Hex bushing
1x 032888110328 1/2in Ball Valve
1x D4301-40 Pipe Joint tape
1. Take out faucet valve by unscrewing from inside of cooler, remove rubber grommet
2. Install ball valve assembly through cooler from outside in:
Ball valve, tapped nipple, washer
3. Finish assembly from the inside of cooler
O-ring, washer, brass hex bushing tighten firmly
4. Install 3/8in. Barb adapter using the tape, tighten, squeeze over tubing
5. Heat some water, take temp. and you are ready to sparge!:rockin: