scrapplejoe
New Member
I got my summit double kegerator, and will be installing it under my bar that I am building. The run from the tower on top of the bar to the kegerator will be about a foot or so. I went out and bought some pvc and some pipe insulation. Is this the right way to do it or is their an easier and more effective way?