Hi here are my plans for my new brewery Build
It has been designed my me from somewhere between a brutus 10 and brewmagic systems and lots of other info I have found helpful from mainly this site so Thanks to all
It is going to be for a 10-15 Gallon system Using 2 x 15 gallon blichmann boilermaker pots for my mash tun and hot liquor tank. And a 20 gallon blichmann boilermaker for my boil pot
It will have 2 march pumps for running the rims system during the mash and for running the chilling system after the boil. This will also allow for me to maybe in future to upgrade and run the hot liquor tank with a direct fire system like the Brutus 10.
The rims system I will be using is rims for dummies by sawdust guy but using 1.5" pipe https://www.homebrewtalk.com/f51/rims-dummies-114997/
It will also have 3 130,000 BTU natural Gas burners.
It will be set up in my garage with a hood and exist for the steam and CO
I have drawn on the control panel as of yet as I dont have all the components to put it all together. Plans for this will be out as they are made.
I have just ordered the steel all cut to lengths and have the burners and stainless for mash flow and rims heater
Still quite a bit to Get
But will keep this updated with pictures and info as the build comes along
If anyone has any comments or suggestions please let me know if you can use cad I can send you the DWG file to use if you like
Thanks Chewie
It has been designed my me from somewhere between a brutus 10 and brewmagic systems and lots of other info I have found helpful from mainly this site so Thanks to all
It is going to be for a 10-15 Gallon system Using 2 x 15 gallon blichmann boilermaker pots for my mash tun and hot liquor tank. And a 20 gallon blichmann boilermaker for my boil pot
It will have 2 march pumps for running the rims system during the mash and for running the chilling system after the boil. This will also allow for me to maybe in future to upgrade and run the hot liquor tank with a direct fire system like the Brutus 10.
The rims system I will be using is rims for dummies by sawdust guy but using 1.5" pipe https://www.homebrewtalk.com/f51/rims-dummies-114997/
It will also have 3 130,000 BTU natural Gas burners.
It will be set up in my garage with a hood and exist for the steam and CO
I have drawn on the control panel as of yet as I dont have all the components to put it all together. Plans for this will be out as they are made.
I have just ordered the steel all cut to lengths and have the burners and stainless for mash flow and rims heater
Still quite a bit to Get
But will keep this updated with pictures and info as the build comes along
If anyone has any comments or suggestions please let me know if you can use cad I can send you the DWG file to use if you like
Thanks Chewie