Ridemywideglide
Well-Known Member
Well here's my plan. A couple jpg's and the sketchup file.
I should be getting the steel this weekend or early next week. I'll be using two bg14's and a 6 inch bg12 clone. The pics and sketchup just show 14's.
Future improvements will be automation, and eventually "flex-fuel", having the option run electric or propane depending on where I'm located.
Also going 1.25", vs the 2" shown. I just modified an existing sketchup brewstand (Bobby's I believe) and didn't want to spend time changing all the pipes. Overall dimensions will be the same.
I can't upload the sketch, I'll edit in a few with a link..
<this should work>
http://sketchup.google.com/3dwarehouse/details?mid=dd6d71853ccb839bcbbf41df7a73c35d
I should be getting the steel this weekend or early next week. I'll be using two bg14's and a 6 inch bg12 clone. The pics and sketchup just show 14's.
Future improvements will be automation, and eventually "flex-fuel", having the option run electric or propane depending on where I'm located.
Also going 1.25", vs the 2" shown. I just modified an existing sketchup brewstand (Bobby's I believe) and didn't want to spend time changing all the pipes. Overall dimensions will be the same.
I can't upload the sketch, I'll edit in a few with a link..
<this should work>
http://sketchup.google.com/3dwarehouse/details?mid=dd6d71853ccb839bcbbf41df7a73c35d