GrimyHoboSack
Active Member
I'm building a pump in a toolbox build and I'm having a bit of a problem getting my pipe fittings attached to it to work out properly. My problem is that I can't seem to get the T (and to a lesser extent the ball valves) both tight and aligned in the correct direction. Any tips on how to get this to work out right with plumbers tape and tightening or am I better off reading through the "soldering steel" thread at the top of the page and trying to go that route?