HarvInSTL
Well-Known Member
I've had a 5000btu A/C unit sitting around since last summer, along with a 15gal plastic conical since January 2008. Now that we bought a house a few months ago I finally have room for all of my brewing stuff.
It is now time to build a cabinet to house my fermenting beer so that I can maintain the temps.
Below is my first draft, it is still missing the following:
Sides & fronts w/ doors
Ventilation from the upper chamber to the lower chamber
(Including fans)
Now I do have a couple of questions. Is the 2" insulating foam required or could I get away with use the 1"? I'd rather purchase 3 sheets of $11 foam rather than purchase 3 sheets of $25 foam.
Here a couple pictures of what is to come.
It is now time to build a cabinet to house my fermenting beer so that I can maintain the temps.
Below is my first draft, it is still missing the following:
Sides & fronts w/ doors
Ventilation from the upper chamber to the lower chamber
(Including fans)
Now I do have a couple of questions. Is the 2" insulating foam required or could I get away with use the 1"? I'd rather purchase 3 sheets of $11 foam rather than purchase 3 sheets of $25 foam.
Here a couple pictures of what is to come.