mikefromcu
Well-Known Member
I'm getting about ready to weld this up, so I thought I'd check through here for commentary and have another set or a hundred sets of eyes to look it over first.
This is for my new licensed nano-brewery in San Diego, Hess Brewing. For those interested in going pro, we've put a lot up on our blog at blogspot.hessbrewing.com.
This is a system designed like a MoreBeer 2100 but with 65 gallon kettles so I can net out 51 gallons per batch - two standard 1/2 bbls and 4 sixtels per batch, and with an extra kettle - whirlpool - so I can get two batches out just a couple hours after the first.
This is the schematic showing the top down and front view. The piping is not quite done, but the 2x2 is all in place.
http://img696.imageshack.us/img696/341/brewerystand.png
And this is detail of the tippy dump bracket and journal (and casters).
http://img200.imageshack.us/img200/8969/tippybigger.png
In this photo, I put a white translucent box over the top of the tippy junction - that will be milled out and the half round welded in place.
Thanks!
This is for my new licensed nano-brewery in San Diego, Hess Brewing. For those interested in going pro, we've put a lot up on our blog at blogspot.hessbrewing.com.
This is a system designed like a MoreBeer 2100 but with 65 gallon kettles so I can net out 51 gallons per batch - two standard 1/2 bbls and 4 sixtels per batch, and with an extra kettle - whirlpool - so I can get two batches out just a couple hours after the first.
This is the schematic showing the top down and front view. The piping is not quite done, but the 2x2 is all in place.
http://img696.imageshack.us/img696/341/brewerystand.png
And this is detail of the tippy dump bracket and journal (and casters).
http://img200.imageshack.us/img200/8969/tippybigger.png
In this photo, I put a white translucent box over the top of the tippy junction - that will be milled out and the half round welded in place.
Thanks!