Going pro soon so I'm building a simple 10 X 22 building to be the Brew Hause.
It will have a 4 X 9 cold room in the back for fermentation and storage. I'll also have my 4 tap (for now, max is 8) keezer in there as well as other pieces pertaining to the brew process. I'll have a 3 tier sculpture once the building has a roof on it. As the business grows so will the equipment.
Here's what I have so far.
Raw ground
'dozer leveling the spot
Base framework finished
Framing almost done
Side walls up
It will have a 4 X 9 cold room in the back for fermentation and storage. I'll also have my 4 tap (for now, max is 8) keezer in there as well as other pieces pertaining to the brew process. I'll have a 3 tier sculpture once the building has a roof on it. As the business grows so will the equipment.
Here's what I have so far.
Raw ground
'dozer leveling the spot
Base framework finished
Framing almost done
Side walls up