landshark
HMFIC
Figure I'll add to the endless wonderful threads here.
Pics suck, as these are off an old iphone. (These were lost on a server, so I'm updateing from my photo-bucket account)
Boiling one of my first 10 gallon batches prior to going electric
The Keezer in build, missing one faucet
Initial first run of the keezer
Test fitting I could get 4-ball-lock kegs in the base!!!
Added the collar and temp control
Finished and in place!!
Pics suck, as these are off an old iphone. (These were lost on a server, so I'm updateing from my photo-bucket account)
Boiling one of my first 10 gallon batches prior to going electric
The Keezer in build, missing one faucet
Initial first run of the keezer
Test fitting I could get 4-ball-lock kegs in the base!!!
Added the collar and temp control
Finished and in place!!