MaxxxPower
New Member
- Joined
- Oct 12, 2012
- Messages
- 3
- Reaction score
- 0
Hey everyone,
I'm resuming a kegerator project I started about 5 years ago. Back then I basically found the coolant line in the top, drilled a hole for the tubing, mounted the draft tower with one screw through the top of the fridge and called it a day.
I'm finally getting around to finishing it the right way, but it looks like I've lost the screws that hold the plastic top on the fridge.
Can anyone guide me in the right direction as to what size screws are used? I remember them being sharp and about 1/2" long, but I was wondering if anyone also had one and could let me know what they are to save me some guesswork, and if the 3 in the back are the same as the 4 in the front. If the same screws are used somewhere in the door I do have that intact.
Thanks in advance
I'm resuming a kegerator project I started about 5 years ago. Back then I basically found the coolant line in the top, drilled a hole for the tubing, mounted the draft tower with one screw through the top of the fridge and called it a day.
I'm finally getting around to finishing it the right way, but it looks like I've lost the screws that hold the plastic top on the fridge.
Can anyone guide me in the right direction as to what size screws are used? I remember them being sharp and about 1/2" long, but I was wondering if anyone also had one and could let me know what they are to save me some guesswork, and if the 3 in the back are the same as the 4 in the front. If the same screws are used somewhere in the door I do have that intact.
Thanks in advance