Anthony_Lopez
Well-Known Member
Well, I've been doing some serious thinking about space, repeatability, and the overall process of my brew day. A friend of mine has the ability to get me some steel tubing at or below cost. Since I already have a March Pump and I'm having good luck with batch sparging (80% efficiency on average) I'm going to start a single tier build. I will outline absolutely everything for this build including the wiring of EACH component, installation, cut sheet for the steel, and I will make a running count on cost. FYI- I do get a lot of fittings for almost free (work salvage) so some of my costs will be referenced off Ebay or other vendors.
I spent the day figuring out google sketch up to draw out my plans. This will most likely be built from 2"x2" steel tubing. If things change I will alter the design for anyone that may want to follow. I'll keep posting as I get things together.
I spent the day figuring out google sketch up to draw out my plans. This will most likely be built from 2"x2" steel tubing. If things change I will alter the design for anyone that may want to follow. I'll keep posting as I get things together.