hatrickwah
Sponsor
I am hoping the electric brew rig gurus can help me here.
Yesterdays brew started with an excessive propane bill, therefore the wife and I both agree, electric brewing is in our future. The problem I have however, is that what I plan to ultimately build is a little steep on the price right now. I want to go with a BCS build based on OhioEd's panel, but will probably use Tiber_brew's kettle design. I already have the keggles built and am using them on gas right now.
Can someone tell me how to wire a 220v element, 5500w element to a 40a SSR that is controlled by my spare PID controller? I plan on changing my BK over first due to issues with the propane burner. I will ultimately go to 220 with it, but today that card is not available.
Yesterdays brew started with an excessive propane bill, therefore the wife and I both agree, electric brewing is in our future. The problem I have however, is that what I plan to ultimately build is a little steep on the price right now. I want to go with a BCS build based on OhioEd's panel, but will probably use Tiber_brew's kettle design. I already have the keggles built and am using them on gas right now.
Can someone tell me how to wire a 220v element, 5500w element to a 40a SSR that is controlled by my spare PID controller? I plan on changing my BK over first due to issues with the propane burner. I will ultimately go to 220 with it, but today that card is not available.