I have somewhat unusual setup with my hosehead and wanted to get everyone's input.
I use RIMS for mashing and have brewhardware Hot Rod heat stick used in my HLT and BK.
Hosehead has 3 probes - yellow, blue, and black. You are able to associate the element 1 and element 2 outputs with the...
I was able to get everything hooked up. I had 3/4" conduit already run, but I was not able to fish another 6 gauge wire through it even with a sweeping 90 degree joint. So I took the conduit apart in one section and removed all cabling going to my outdoor sub panel. I ran the 6 gauge through my...
I'll give it try and see. The instructions didn't have an option for 3 wire hookup, but I read on the internet where it could work.
I will likely use 6 gauge stranded rather than solid. My guess it that will be easier to fish through the conduit.
Appreciate your reply and insight.
The SER heavy gauge aluminum wire going from my main panel to my sub panel does have 2 hot legs, neutral, and bare ground. The neutral and ground are connected to shared bar/bus at the sub panel.
My thought was to take the neutral off that shared bus/bar at...
I have a hosehead controller with a 5500 watt element. I will add another hot pod that I can use between my HLT and BK eventually. Right now my setup is RIMS/propane hybrid.
This panel will never require 120V. The hosehead has a dedicated 120V circuit that is plugged to a separate 120V outlet.
Quite serendipitous that this showed up. I attempted to hook up a Eaton 50 AMP spa panel this weekend. I got #6-3 wire and realized my fault when we attempted to hook up the spa panel which calls for a neutral.
Essentially my setup is the following:
70A double pole breaker feeding from my...
I have a similar problem as my indicator lights illuminate, but I never hear the relay click. I have no power at the outlets either.
I am using a Raspberry Pi 2. Everything else is working as expected, but that one vital piece :) .
Let us know how it goes. I'm seriously considering purchasing one and got a guy in our club interested as well.
I think he has 6 day lead time so that could be the reason for the long ship times.
Thank you for your help. When I measure GND and IN2, I get 4.18 DCV and 8.2 ACV.
When I move the wire from the wire on pin 6 from the Aruduino to IN1, it lights up the IN1 relay indicator LED and no click.
This same wiring worked on my previous Raspberry Pi Model B, so I would expect it to...
The jumper is set to JD-VCC to VCC .
Controller Pin 5(Act2) is set to inverted, chamber device, and is the heater - value is Inactive
Controller Pin 6(Act1) is set to inverted, chamber device, and is the cooler - value is Active and brewpi says it is cooling.
I