So I started homebrewing a few weeks ago and I am about a week away from kegging my first two brews. I decided that I wanted to build a keezer after seeing Jester's build on here among countless others.
I started with a small 5.6 cu.ft. freezer that I picked up on craigslist for $50 and then headed to the hardware store. Below are some photos of the progress, everything is done except for the temp controller and the tile top. I purchased a temp controller on ebay but didn't realize that it was designed for heating only so I have a new one on the way.
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
I started with a small 5.6 cu.ft. freezer that I picked up on craigslist for $50 and then headed to the hardware store. Below are some photos of the progress, everything is done except for the temp controller and the tile top. I purchased a temp controller on ebay but didn't realize that it was designed for heating only so I have a new one on the way.
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05
By pannell77 at 2012-05-05