NTabb
Well-Known Member
Guys,
Need some input if this diagram looks correct. I only want to run one element at a time and be able to switch between them with a 3 position switch. The system will be controlled with a BCS460 that I've been using for about a year now. The part I'm getting confused on is the mechanical relays and the 3 position switch. Thanks for any input!
Need some input if this diagram looks correct. I only want to run one element at a time and be able to switch between them with a 3 position switch. The system will be controlled with a BCS460 that I've been using for about a year now. The part I'm getting confused on is the mechanical relays and the 3 position switch. Thanks for any input!