Here is my setup so far. Just finished epoxying the floor, placing the cabinets and setting it up as my man cave/brew station. Will ultimately be three 15 Gallon spike brewing kettles. Just completed putting in a 50A outlet with GFCI breaker in the main garage panel. My question is where would be a good place to put my electric brew panel? The panel will be the 50A panel for back to back batches from "The Electric Brewery". I have attached a picture with a proposed location above the sink on the Right. Let me know what you guys think about my setup and any other suggestions. The other location I had thought about was on the cabinet to the left but it would be facing one of the kettles and was worried about steam near the panel.