Pump w/fittings, chiller (19" x 30 plates) w/fittings and aeration stone for wort out!
Last bit is mounting these two pieces.
Almost ready to brew!!!
where did you get the fittings?
Only for after things are dry and are being put away (storage). I take my pump head, and chiller, off my rig after each batch to thoroughly clean and dry.
Just got this to help with monitoring mash temps:
www.thermoworks.com/products/low_cost/rt610b_12+24.html
It should help me ensure mash temp doesn't get too high during recirculation. Probably will use this rather than adding a Tee and NPT thermometer to wort in.
Added mount plates for pump and chiller. Just need to drill holes and attach. I feel a test boil in a couple days.
I feel cold bro! I can't really brew again until it's warm enough for me to use the garden hose for chilling. But I want to do it soon so I can reuse my lager yeast
BTW - I'm still working on an idea to make my brew rig nicer (wifey complained about my current one being all ugly) and maybe later this year we can brainstorm together?
Any new pics?