Just got done with phase one of my erector set brew stand. Couple burners, electrical, gas lines, and a pump should finish it off. Also another keggle.
EDIT: Since i originally posted this i have ordered basically everything I need except for some iron pipe/fittings and a waterproof electrical box (Which will house http://www.amazon.com/dp/B000HAVVKG/?tag=skimlinks_replacement-20 ) Kind of went on a spree there, but i should be up and running before the next brew day!
Only thing i can say is that the steel got red hot (Literally) and warped a bit under the weight of the half full kettle when i did a test run on the burner. I might fill it up all the way and see what happens, re-enforce different areas... etc etc.
EDIT: Since i originally posted this i have ordered basically everything I need except for some iron pipe/fittings and a waterproof electrical box (Which will house http://www.amazon.com/dp/B000HAVVKG/?tag=skimlinks_replacement-20 ) Kind of went on a spree there, but i should be up and running before the next brew day!
Only thing i can say is that the steel got red hot (Literally) and warped a bit under the weight of the half full kettle when i did a test run on the burner. I might fill it up all the way and see what happens, re-enforce different areas... etc etc.