flyfshrmn98
Well-Known Member
- Joined
- Feb 26, 2015
- Messages
- 63
- Reaction score
- 2
I am in the process of converting a danby mini fridge into a 2 keg kegerator. I recently purchased a used double beer tower online to use as part of the build. Turns out it is THIS model I had planned on using copper pipes to cool the tower but now I'm not sure what to do with all the tubing already in the tower. I guess it was glycol cooled. It has 2 metal tubes with barbs and 2 PEX type tubing tubes all about 18-24" long coming from the tower. How should I go about cooling the tower and also how should I clean the lines. Open to all thoughts and suggestions, thanks.