I am trying to make the jump to the e-brew bandwagon. I am planning on using this (http://mennen.org/EVSE/index.htm) to divert 220/240 from the dryer to support the new system.
I am just not sure what elements to run
A typical brew day is 2-3 5gal batches with 2 burners (Boil and HLT) and a 1500w rims tube for the mash with 2 Chugger pumps on a separate breaker and a 12v pump for the HLT. The batches are staggered and at times everything is running at once (Boil burner with pump 1 whirl pooling) (Mush tun with RIMS and pump 2) (HLT burner heating water and 12v pump circulating).
If I replace the two burners with heating elements, I fear I will not have enough power from the 220/240.
I am just not sure what elements to run
A typical brew day is 2-3 5gal batches with 2 burners (Boil and HLT) and a 1500w rims tube for the mash with 2 Chugger pumps on a separate breaker and a 12v pump for the HLT. The batches are staggered and at times everything is running at once (Boil burner with pump 1 whirl pooling) (Mush tun with RIMS and pump 2) (HLT burner heating water and 12v pump circulating).
If I replace the two burners with heating elements, I fear I will not have enough power from the 220/240.