Well, good news, I found a local shop that will be fabbing up the vent hood at a reasonable price, so that is on order. I expect that should be ready in about a week, so in the interim, I worked on putting together another one of the probe cables AND installed some lighting.
Started with an 8ft section of track and cut it in half to mount the two sections over the brew area, and then another over the cleaning area:
Wired up a switch since the previous light was just a simple pull-cord base light.
First section lit up. I used 3 LED Spots for each of the Kettles, and 2 CFLs of matching color temperature for fill light:
Second Section up and Lit, using 2 larger CFLs and 1 Fill CFL in the center:
The Area Lit:
And, last I got another one of the probe cables together. Just one to finish and then I'll have the temperature probes ready to install into the fitted kettles!
More to come in the next couple of days. I expect the Vent-Hood might be done by this coming weekend, which would be a major step towards finishing the brew-space!
Started with an 8ft section of track and cut it in half to mount the two sections over the brew area, and then another over the cleaning area:

Wired up a switch since the previous light was just a simple pull-cord base light.

First section lit up. I used 3 LED Spots for each of the Kettles, and 2 CFLs of matching color temperature for fill light:

Second Section up and Lit, using 2 larger CFLs and 1 Fill CFL in the center:

The Area Lit:

And, last I got another one of the probe cables together. Just one to finish and then I'll have the temperature probes ready to install into the fitted kettles!

More to come in the next couple of days. I expect the Vent-Hood might be done by this coming weekend, which would be a major step towards finishing the brew-space!