bobtheUKbrewer2
Well-Known Member
- Joined
- Dec 17, 2008
- Messages
- 450
- Reaction score
- 85
Hello all, yesterday I brewed a 4% SMASH beer. 24 hours after yeast pitch it is fermenting like crazy and is at 27 deg C in a room that is at 23 deg C.
I cannot control the temperature so I just hope it tastes ok. Other than not brewing June to September, any suggestions. I wondered about a box within a bok and the gap between the boxes filled with frozen 2 litre PET water bottles. Thanks.
I cannot control the temperature so I just hope it tastes ok. Other than not brewing June to September, any suggestions. I wondered about a box within a bok and the gap between the boxes filled with frozen 2 litre PET water bottles. Thanks.