LoloMT7
Well-Known Member
Hi all I brewed this last Saturday and split the 6 gallon batch into two separate 3 gallon carboys. The post-boil OG was 1.066 and both were at room temp which is about 66 degrees. 66 is what is still reading on the stick-on thermometers also. The problem is one of the Carboy's I pitched one package of US-04 into and it is actively fermenting away just fine. The other I pitched Nottingham Dry Ale yeast into and it has been 72 hours now and nothing doing. Maybe I should wait it out a bit longer or is it time to re-pitch? Also if I pitch more yeast does it need to be Nottingham since that is what i pitched into the carboy already? Would it totally mess things up if I pitched a package of US-05 because I have a pack of that handy!
Thanks for any advice! 
