breweringbeaz
Well-Known Member
- Joined
- Nov 16, 2012
- Messages
- 172
- Reaction score
- 6
I think I have Identified my problems however I haven't totally made solutions for next time. Problems occurred during the mash and sparge. Brewsmith calculated I needed 8 gallons for a 5.5 gallon 90 min boil. By doing this (a) it threw off my pre boil gravity (b) took forever to boil down to get somewhere in the neighborhood of my OG. Has anyone had this happen to before? Thanks w